Structured Cabling
The part of your IT that should last longer than any laptop
We design the points, run the cable, build the rack, label both ends and test every link. You get a tidy comms room today and a network that is easy to change later.
IT Infrastructure & Structured Cabling
Cabling sits inside walls and ceilings for many years. Switches and laptops get replaced, but the cable stays. When it is done badly, you feel it every day: a rack that looks like a bird’s nest, desk points with no labels, a slow link that nobody can trace and a technician who needs an hour to find one cable.
We plan cabling from your fit-out drawings: data points per desk, meeting-room screens, access points, printers and cameras. We install Cat6 or Cat6A copper and fibre where distance or speed needs it, build the rack with patch panels and cable management, label every point at both ends and test each link. At handover you receive the test results and an as-built plan that matches the labels on the wall. We also coordinate with your fit-out contractor and building management on work permits, ceiling access and riser routes, and with e& or du on where the internet line enters your office.
What we deliver
IT Infrastructure & Structured Cabling: our services
-
Point layout and design
We mark every data point on your floor plan: desks, meeting rooms, reception, printers, access points and cameras, with spare points where your team is likely to grow.
-
Cat6 and Cat6A copper cabling
Cat6 suits most offices. Cat6A makes sense for 10 Gbps links, longer runs and busy PoE devices such as access points and cameras. We explain the choice before you decide.
-
Fibre backbone links
Fibre between floors, between units in the same building or between an office and a warehouse on one plot, where copper is too short or too slow.
-
Racks and comms rooms
Wall-mount or floor racks with patch panels, cable managers, power distribution and space for a UPS. We also check that the room has enough ventilation for the equipment.
-
Labelling that matches the plan
Each point carries the same label at the desk, on the patch panel and on the drawing. Anyone can trace a cable in seconds, years later.
-
Testing and test reports
Every copper and fibre link is tested before handover, and you receive the results. Faults are found while the contractor is still on site, not after the ceiling is closed.
-
Rack clean-up and re-cabling
For offices with messy racks and unknown cables, we trace, remove dead cable, re-patch neatly and label everything, usually after hours or at the weekend.
-
Office moves and fit-outs
We join the fit-out early, agree cable routes with the contractor and plan the move so your team can log in and work on the first morning in the new office.
Process
How we deliver it
Clear steps, a working demo early, and you see progress every week.
-
Site survey and drawings
We walk the space, review the fit-out drawings and check ceilings, risers and where the internet line comes in.
-
Design and quotation
You get a point plan, a rack layout and a clear quotation that lists cable type, quantities and what is included.
-
Coordination and permits
We align with your fit-out contractor’s schedule and support the building management approvals needed for work and access.
-
Installation
Cable is run before the ceiling closes, then terminated, patched and dressed neatly in the rack.
-
Testing and labelling
Every link is tested and labelled. Anything that fails is fixed and tested again before handover.
-
Handover pack
You receive the as-built plan, test results and rack photos, ready for your facilities team or any future IT provider.
Business value
What your business gets
-
Fewer hidden faults
Tested links remove a common cause of slow or dropping connections, which is hard to find once the ceiling is closed.
-
Faster changes later
With clear labels and spare points, moving a desk or adding a screen takes minutes of patching, not a new cable run.
-
Ready for growth
Cable type and rack space are chosen with the next few years in mind, so new access points or cameras do not mean opening walls again.
-
Proof of quality
Test results and as-built drawings show exactly what was installed. That helps with landlord handovers and with any future provider.
Technology
Tools and platforms we use
We pick the stack for your needs, your team and your budget. These are the tools we use most for this service.
Copper cabling
- Cat6 U/UTP
- Cat6A U/FTP
- RJ45 keystone jacks
- Patch panels
- Patch cords
Fibre
- Single-mode OS2
- Multi-mode OM3
- Multi-mode OM4
- LC connectors
- Fibre patch panels
Racks and power
- Wall-mount racks
- Floor-standing racks
- Cable managers
- Rack PDUs
- UPS
Testing and records
- Copper link testing
- Fibre loss testing
- Printed labels
- As-built drawings
Industries
Where this works best
Use cases
Real examples in the UAE
-
A new office fit-out in a Dubai tower
The fit-out contractor needs the data layout before the ceiling is closed. We agree point positions from the drawings, work within the tower’s permit rules and test everything before furniture arrives, so the move date holds.
-
A clinic before opening
Reception, consultation rooms, a small lab and the waiting area each need different points: PCs, label printers, screens, access points and cameras. A clear plan keeps medical equipment areas and IT points from clashing.
-
Linking an office to its warehouse
A trading company has its office and warehouse on the same plot, but the warehouse has no reliable network. A fibre link between the two buildings brings the warehouse onto the office network for scanners, printers and cameras.
-
A weekend rack clean-up
Years of quick changes left a rack nobody wants to touch. Over a weekend we trace every cable, remove the dead ones, re-patch with the right lengths and label everything, so Monday starts with the same services, just organised.
How we work with you
Pick the way that fits
-
Project-based
A clear scope, a written plan and a fixed quote. We deliver the project in stages, and you approve each one.
- Written scope, timeline and cost before work starts
- Milestones with demos you can test
- Changes handled through a simple, agreed process
- Handover with documents, training and access
Best for: Websites, MVPs, e-commerce stores and AI projects with a clear goal.
-
Dedicated team
A team that works on your product month after month, like an extension of your own staff, with flexible priorities.
- A monthly plan with the skills you need
- Priorities you can change every sprint
- Direct contact with the people doing the work
- Regular reports on progress and time spent
Best for: SaaS products, growing platforms and long projects where needs change often.
-
Monthly support (AMC)
A monthly or yearly plan that keeps your systems, website and office IT updated, backed up and secure.
- Updates, security patches and backups
- Help desk by phone, email and WhatsApp
- Monitoring, with regular health checks
- Hours for small changes and new features
Best for: Offices, clinics, shops and companies that want one team to call for all tech issues.
Project brief
Start your IT Infrastructure & Structured Cabling project
Two minutes is enough. We reply within one working day with next steps, or a question or two.
- Your details stay with us (UAE PDPL).
- Write in Arabic or English.
- Mon–Sat, 9:00–18:00
FAQ
IT Infrastructure & Structured Cabling: frequently asked questions
Should we choose Cat6 or Cat6A?
For most offices, Cat6 is enough for desks and printers. Cat6A is worth it for 10 Gbps links, longer runs, and places with many PoE devices, such as Wi-Fi access points and cameras. We often mix the two: Cat6 for desks and Cat6A for access points.
How many data points does each desk need?
Many offices plan two points per desk: one for the computer and one spare for a phone or a second device. Meeting rooms, printers, access points and screens are counted separately. We agree the final number with you during design.
Can you work at night or at the weekend?
Yes, if the building allows it. Many towers and malls limit noisy work or contractor access to certain hours, so we check the rules with building management first and plan the work around them.
Do you work with our fit-out contractor?
Yes. We share drawings, agree cable routes and containment, and match our work to their schedule. The earlier we are involved, the easier it is to avoid opening ceilings twice.
Who gets the building approvals?
The approval itself comes from your landlord or building management, usually through your fit-out process. We prepare the details they ask for about our team and our work, and follow the rules they set on site.
Do you arrange the internet line?
The line contract is between your company and e& or du. We help you with what to ask for, coordinate the installation visit, make sure the line reaches the rack and connect it to your network.
Can we reuse the cabling in the office we are moving into?
Sometimes. We test the existing cable and check its type, labels and rack. If it passes and fits your layout, you save time and cost. If it is old or poorly installed, we tell you before you rely on it.